E2M Crypto Mining Hosting Service- 0.057$ all in
Site: E2M self-operated mining farm in Ethiopia
Price:0.057$ including electricity&operation&maintenance
Overall load available:5MW
On/Off shelves cost:on shelves: 3$/unit,off shelves:3$/unit.
Electricity deposit:one month electricity bill
Contract term:1 year
MOQ for hosting:100 units
Power consumption ratio:at most 22W/T
Operation stability: In the last two weeks, the power stability is basically 100%.
The 5MW load is located on a site with a total load of 60MW. At present, it can supply 30MW load. In the early stage, for machines at 5000KW load is adequate.